TPG is proposing the following works:
Installation of a PIPE Networks fibre service to a customer.
Proposed Start Date: Monday 30 October 2017 – Sunday 30 September 2019
Location: 113-117 Punchbowl Rd, Belfield
Details of works:
- Survey and inspect the land.
- Open cut trench and/or directional boring to install conduit/pits.
- The installation of fibre optic cable via hauling through existing conduit
Contact details:
Should you have require any further clarifications regarding this matter, please contact Tom Klein on 9079 9023 or on tom.klein@tpgtelecom.com.au